Overview

The Mzimvubu Hydro Project is a hydroelectrical and water supply project. Phase 1: construction of two low dams (less than 30m high) equiped with turbines producing 44MW base load power and 308MW peak hours power through pump-storage. Phase 2: construction of a major dam (225m high), producing 220MW base load power, 1540MW peak hours power through pump-storage, and 900 million m3 of water for irrigation and water supply to the existing network.

Investment Needs

$10 000 000,00

Investment Project Type:

Equity, debt, blended finance, grant funding, strategic partner, off take agreement.

Invested Value to Date:

$6 000 000,00

Funding Gap:

$4 000 000,00

Climate Classification:

Adaptation

Why Investing

1
Critical Renewable Energy & Water Infrastructure
The project addresses Southern Africa’s urgent energy and water needs by providing reliable base-load renewable electricity alongside water supply, supporting the transition away from coal.
2
Enables Greater Renewable Energy Integration
Its energy-storage capacity can store excess solar and wind power during low-demand periods and release it during peak hours, helping optimise the wider renewable energy system.
3
Proven Viability & Long-Term Security
Independent pre-feasibility and financial modelling indicate that both phases are economically viable, while the 40-year Water Use License provides important long-term regulatory security.
Advertise With VUKA Group

Advertise With VUKA Group

Contact Us

Want to Generate Opportunities?

VUKA is the trusted media partner to key professionals, policy makers, suppliers and
manufacturers. We provide unparalleled opportunities for industry-wide connection.