Location
Tamale, Northern GhanaSector
Circular economyStage
Concept StageGhana generated 648,418 metric tons of electronic waste in 2023, a figure expected to rise to 2.8 million tons by 2040 (EPA, 2023). The sector contributes an estimated US$105–268 million a year to the national economy, and employs 20,300 to 32,000 people, almost all informally, through manual dismantling and open burning that create hazardous working conditions and become a major source of pollution. Yet most of the value contained in this waste never stays in Ghana: printed circuit boards, the highest-value fraction, are sold on as low-grade scrap and refined abroad.
This project establishes an integrated collection-to-recovery facility for e-waste PCBs in Ghana. It redesigns the metal recycling value chain by siting recovery technology close to where the waste is generated, using BioMetallica’s modular metal recycling unit. Its patented process recovers gold, silver, PGMs and copper at low operating cost and with a low environmental footprint. The unit is supplied with feedstock by an existing Ghanaian value chain built and operated by AppCyclers. Feedstock is mobilised from informal collectors, scrap dealers, aggregators and institutional generators, then collected, aggregated, dismantled and processed.
The project builds on proven components: BioMetallica’s technology has been tested and validated at pilot scale, and selected for European projects. AppCyclers’ collection and pre-processing network is contracted and running today, coordinated through its AYAT digital platform. What this project does is integrate them and demonstrate the combined system at commercial volume.
Delivery runs in two phases. Phase I is a three-year pilot, comprising one year of feasibility assessment, capacity building, engineering, construction and commissioning, followed by two years of integrated operation, designed to prove end-to-end processing of locally generated e-waste at commercially viable volumes. Phase II is a twenty-year scale-up: expanded processing capacity, regional aggregation hubs, longer-term feedstock and offtake contracts, and validation of additional e-waste streams.
The model can grow in two directions. Drawing on BioMetallica’s wider portfolio of technologies, the facility can be extended to treat other waste streams, from end-of-life solar PV to batteries. It can be replicated in other African countries that share Ghana’s profile: high waste generation, a dominant informal sector, and little existing recovery infrastructure.
Why it matters:
Building recovery infrastructure on site keeps the value of gold, silver, PGMs and copper in the country, formalises income for informal-sector workers, and removes hazardous material from unregulated streams, improving worker health and environmental outcomes at the same time.
How we win:
Recovery technology with low operating cost and a low environmental footprint, matched to an existing, operating collection network. Capacity can be added as feedstock volumes grow, and the same model can be extended to new waste streams and new markets.
Why now:
Ghana’s consolidated e-waste regulation under one framework with heavier penalties, narrowing the space for unregulated processing. The national E-Waste Fund, financed by an advance eco-levy, has accrued over GH¢60 million and is now being disbursed across the value chain. The government has also announced restrictions on non-ferrous scrap exports to give domestic processors priority access to raw material.
Investment Needs
$5 400 000,00Investment Project Type:
Blended finance, grant funding, strategic partner.Invested Value to Date:
$0,00Funding Gap:
$5 400 000,00
Contact Us
VUKA is the trusted media partner to key professionals, policy makers, suppliers and
manufacturers. We provide unparalleled opportunities for industry-wide connection.