Ask a hyperscaler procurement team what matters most in a Request For Information (RFI) and they’re start talking about PUE (which in this case does not mean productive use of energy).Â
If you ask a facilities engineer running a water-cooled chiller the same question, they’ll start talking about cost and not efficiency being what drives the conversation.Â
The vocabulary of data centre cooling is expanding quickly because the infrastructure is evolving so fast. The concepts of closed-loop systems, rear-door heat exchange or water usage effectiveness metrics didn’t even exist in mainstream conversations ten years ago.Â
And now that’s all being reshaped again by AI-driven rack densities.Â
Here’s the start of a working glossary in progress for a sector whose terminology is being written in real time. This was compiled after the Water Security Africa panel discussion on water usage at African data centres.
 An evaporative wet-cooling method for data centres.
Effective in some climates, but unsuitable in high-humidity environments such as Nigeria.Â
A wet-cooling method used in data centres, circulating treated water through chillers to remove heat from the facility.Â
A data centre cooling method that circulates a fixed volume of water continuously, limiting consumption to leaks or scheduled treatment.
Widely regarded as the most viable option for water-constrained African markets.Â
A data centre model where an enterprise client houses its equipment in a shared facility rather than building and operating its own, with the operator managing power, cooling and security.Â
The requirement, increasingly enforced by African governments, that data generated within a country be stored and processed within that country, driving hyperscalers to colocate locally.Â
WEBINAR: Webinar: Balancing the scales – climate change, energy security and Africa’s optimal energy mix
A refrigerant-based, air-cooled data centre cooling method requiring no water input.
Common in African markets facing water infrastructure constraints.Â
A cooling method using outside ambient air instead of mechanical systems.
Seasonally available in some South African regions, such as Johannesburg in winter.Â
A very large-scale cloud or data centre operator (eg Google, Meta, AWS) whose facilities require significant power and cooling capacity.Â
A data centre redundancy standard where at least one additional unit of capacity (beyond what’s needed) is available, allowing maintenance without downtime.Â
The standard data centre efficiency metric: total facility energy divided by IT equipment energy.
A lower figure (closer to 1.0) indicates greater efficiency. Widely used because it’s directly billable.Â
A closed-loop cooling method where heat is extracted from server racks at the rear, enabling higher-density scaling without raised flooring or containment.Â
An early-stage procurement document in which a buyer (eg a hyperscaler) asks vendors to share capabilities before a formal bid process.Â
A formal procurement stage in which vendors submit priced, detailed solutions against a buyer’s defined requirements.Â
A data centre design standard requiring concurrent maintainability, meaning any component can be taken offline for maintenance without disrupting operations.Â
A data centre metric measuring litres of water consumed per kilowatt-hour of IT load: the water-equivalent of PUE.
Currently averages around 1.8 litres per kilowatt-hour across Africa.
ALSO READ: How AI and data centres can boost South Africa’s capability for renewable projectsÂ