Overview

Ravensus (Private) Limited, is developing a 50MW AC utility-scale solar PV plant with battery storage on a 3,000-hectare site at Kranspoort Farm, Shangani, Insiza District, Matabeleland South. Phase 1 is the first stage of a planned 100MW facility. The Sponsor is a Zimbabwean SPV owned by Raven Energy, Sustenergy and Amanzi Corp.

Development status: shovel-ready:

– IPP Generation Licence GC0145/2023 (ZERA, valid to 2048);
– 20-year, USD-denominated PPA with the Intensive Energy User Group (IEUG) at USc 9/kWh on a capacity-delivery basis, ZERA-approved;
– SAPP participation approved for surplus power;
– ESIA complete; EMA certificate and Insiza RDC approval in place;
– 50-year notarial lease over the site;
– Qualifies for Zimbabwe’s BOOT tax regime (0% corporate tax years 1–5, 15% years 6–10)/

Technology:

– GCL 705–730W TOPCon bifacial modules on single-axis trackers;
– CATL EnerX battery energy storage system (56.44 MWh);
– EPC by GCL, with Jecca Engineering handling construction and O&M;
– Expected P50 yield of 118,850 MWh/year (~27% plant load factor);

Commercial model:

50W is contracted to IEUG under the PPA, giving a stable USD revenue base. Excess power plus battery discharge, is sold into the SAPP Day-Ahead Market. The battery lets the plant shift energy into higher-priced peak periods, which adds regional cross-border revenue upside. A Catalytic Floor Price Guarantee on SAPP sales is under discussion with RELP to de-risk this merchant revenue.

Financing sought:

– Total project cost is US$60 million, including the BESS, structured 80/20 as –
*Senior debt (US$48m): open to competitive senior debt offers
*Equity (US$12m): open to ordinary equity, preferred/structured equity, or an equity bridge facility

Impact:

-Climate – 116,000 tCO2e avoided per year (indicative, using the SAPP grid emission factor of 0.98 tCO2/MWh), or 2.2 million tCO2e over the PPA term. A carbon credit pathway is being explored;
– Energy security – adds firm, dispatchable clean power to a grid constrained by coal and drought-affected hydro, supplying energy-intensive industry and the regional power pool. Currently region is set to experience El Nino induced drought;
– Economic – construction and O&M jobs in a rural district, local contractor participation, and long-term tax and income.

Why AGES:

Licensing, offtake, grid access and land are all secured, so Shangani is an investment-ready project. We are seeking debt and equity partners to fund the US$60m capital requirement and reach financial close in the near term.

Investment Needs

$60 000 000,00

Investment Project Type:

Debt, blended finance, grant funding.

Invested Value to Date:

$0,00

Funding Gap:

$60 000 000,00

Climate Classification:

Mitigation

Why Investing

1
Ready-to-Build & De-Risked Investment
Shangani has secured licensing, a ZERA-approved 20-year PPA, environmental approvals and long-term land tenure, allowing investor capital to fund construction rather than early-stage development.
2
Predictable USD Revenue with Additional Upside
A USD-denominated, capacity-based PPA covers 50 MW, providing contracted revenue, while excess generation and battery-stored power offer additional revenue opportunities through the Southern African Power Pool.
3
Attractive Economics & Scalable Growth
Strong solar resources, tax incentives and experienced delivery partners support project economics. Phase 1 provides a foundation for expansion to 100 MW, alongside an estimated 116,000 tCO₂e in annual avoided emissions.
Advertise With VUKA Group

Advertise With VUKA Group

Contact Us

Want to Generate Opportunities?

VUKA is the trusted media partner to key professionals, policy makers, suppliers and
manufacturers. We provide unparalleled opportunities for industry-wide connection.